Norman |
Code of Ordinances |
Chapter 13. LICENSES AND OCCUPATIONS |
Article XV. OIL, GAS AND MINERAL PRODUCTION |
§ 13-1506. Earthen ditches and/or dikes.
Latest version.
(a)
Before drilling operations commence, ditches shall be constructed around the drilling rig, sump pumps shall be installed, and all fluid from the sumps shall be pumped into steel containers for removal. Size and location of ditches and dikes that may be required shall be determined by the Oil and Gas Inspector.
(Ord. No. 0-8283-69; Ord. No. 0-9394-43; Ord. No. 0-1415-7, § 7)
Editor's note
Section 7 of Ord. No. 0-1415-7, adopted July 14, 2015, changed the title of § 13-1506 from "Earthen retaining wall" to read as herein set out.