§ 19-507. Permanent markers.
Subdivisions and specific points therein shall be marked as follows:
A.
Standard concrete monuments in accord with the adopted standard of the City shall be placed at all corners and changes in direction of the boundary of the subdivision. Where boundaries are comprised of curves, the point of curvature (P.C.), point of intersection (P.I.), point of tangency (P.T.) shall be monumented. All monuments shall be placed flush with the ground and the four (4) corner monuments shall have at least two (2) reference points established with tie distances not to exceed two hundred fifty (250) feet. In cases where boundaries have more than four (4) corners, the reference ties shall be provided as directed by the Public Works Department.
B.
One (1) permanent benchmark, referenced to the U.S. Geological Survey Datum (mean sea level) shall be established within each subdivision.
C.
The required bench mark shall be in place prior to filing the final plat.
(Ord. No. O-7273-87; Ord. No. 0-0001-15)